Checklists by trade

Carpentry job checklists

Trim / finish carpentry, custom build / cabinet, built-in shelves / closet system, interior door install and more. Here are the common steps for 15 carpentry jobs.

Pick the job you are on. Run down the steps. Print this page for the truck. In the app, pick carpentry as your trade and these jobs load as your checklist, next to your before, during and after photos.

New install

Trim / finish carpentry

  • Material matched
  • Cuts and joints tight
  • Fastened into studs
  • Gaps caulked
  • Nail holes filled and sanded
  • Area cleaned

Custom build / cabinet

  • Measure verified
  • Dry fit
  • Install complete
  • Hardware set
  • Operate checked
  • Protect film removed

Built-in shelves / closet system

  • Layout marked
  • Supports / cleats set
  • Shelves installed
  • Level checked
  • Finish / caulk
  • Cleanup

Interior door install (new)

  • Opening checked
  • Jamb set plumb
  • Door hung with even gaps
  • Hardware installed
  • Casing on
  • Swing and latch OK

Stairs / railing build

  • Layout, rise and run measured
  • Stringers set
  • Treads and risers installed
  • Railing and balusters set
  • Rail height and baluster gaps measured
  • Sanded and ready

Wainscot / accent wall

  • Layout marked
  • Panels / boards set
  • Level checked
  • Nail holes filled
  • Caulked
  • Paint ready

Replace / 1-for-1 swap

Door slab / prehung swap

  • Old door removed
  • Opening checked
  • New door set
  • Hardware on
  • Swing & latch OK
  • Trim restored

Baseboard / casing replace

  • Old trim removed
  • Walls checked
  • New trim cut & set
  • Nail holes filled
  • Caulked
  • Cleanup

Stair tread replace

  • Old treads removed
  • Stringers checked
  • New treads set
  • Secure / no squeaks
  • Finish
  • Cleanup

Repair / service call

Framing repair

  • Structure assessed
  • Members sistered or replaced
  • Plumb and square
  • Fasteners correct for the load
  • Inspection ready (if required)
  • Debris out

Rot / damage repair

  • Damage found & cut out
  • Cause noted
  • New wood installed
  • Sealed / primed
  • Paint ready
  • Photos taken

Door / drawer adjust

  • Issue found
  • Hinges / slides adjusted
  • Swing / glide OK
  • Hardware tightened
  • Tested
  • Customer shown

Renovation / remodel

Wall framing / layout change

  • Layout marked
  • Old wall checked for wires and pipes
  • Old wall removed (if any)
  • New wall framed
  • Header sized and photographed
  • Plumb and square
  • Inspection ready

Kitchen / bath carpentry package

  • Cabinets set
  • Trim & fillers
  • Crown / toe kick
  • Hardware
  • Adjustments
  • Cleanup

Inspect / maintain

Structural / framing check

  • Areas inspected
  • Damage noted
  • Moisture checked
  • Photos taken
  • Repair options listed
  • Report shared

Use these as a base. You know the job best, so add or skip steps to fit it. You are responsible for the work and the customer info you collect. See the Terms.

Not sure which photos to take? See the carpentry job photo checklist. Want these as a print-ready book with a sheet per job type? That is a trade pack, on the pricing page.