Checklists by trade
Carpentry job checklists
Trim / finish carpentry, custom build / cabinet, built-in shelves / closet system, interior door install and more. Here are the common steps for 15 carpentry jobs.
Pick the job you are on. Run down the steps. Print this page for the truck. In the app, pick carpentry as your trade and these jobs load as your checklist, next to your before, during and after photos.
Start a job How it works Print this page
New install
Trim / finish carpentry
Material matched
Cuts and joints tight
Fastened into studs
Gaps caulked
Nail holes filled and sanded
Area cleaned
Custom build / cabinet
Measure verified
Dry fit
Install complete
Hardware set
Operate checked
Protect film removed
Built-in shelves / closet system
Layout marked
Supports / cleats set
Shelves installed
Level checked
Finish / caulk
Cleanup
Interior door install (new)
Opening checked
Jamb set plumb
Door hung with even gaps
Hardware installed
Casing on
Swing and latch OK
Stairs / railing build
Layout, rise and run measured
Stringers set
Treads and risers installed
Railing and balusters set
Rail height and baluster gaps measured
Sanded and ready
Wainscot / accent wall
Layout marked
Panels / boards set
Level checked
Nail holes filled
Caulked
Paint ready
Replace / 1-for-1 swap
Door slab / prehung swap
Old door removed
Opening checked
New door set
Hardware on
Swing & latch OK
Trim restored
Baseboard / casing replace
Old trim removed
Walls checked
New trim cut & set
Nail holes filled
Caulked
Cleanup
Stair tread replace
Old treads removed
Stringers checked
New treads set
Secure / no squeaks
Finish
Cleanup
Repair / service call
Framing repair
Structure assessed
Members sistered or replaced
Plumb and square
Fasteners correct for the load
Inspection ready (if required)
Debris out
Rot / damage repair
Damage found & cut out
Cause noted
New wood installed
Sealed / primed
Paint ready
Photos taken
Door / drawer adjust
Issue found
Hinges / slides adjusted
Swing / glide OK
Hardware tightened
Tested
Customer shown
Renovation / remodel
Wall framing / layout change
Layout marked
Old wall checked for wires and pipes
Old wall removed (if any)
New wall framed
Header sized and photographed
Plumb and square
Inspection ready
Kitchen / bath carpentry package
Cabinets set
Trim & fillers
Crown / toe kick
Hardware
Adjustments
Cleanup
Inspect / maintain
Structural / framing check
Areas inspected
Damage noted
Moisture checked
Photos taken
Repair options listed
Report shared
Use these as a base. You know the job best, so add or skip steps to fit it. You are responsible for the work and the customer info you collect. See the Terms .
Not sure which photos to take? See the carpentry job photo checklist . Want these as a print-ready book with a sheet per job type? That is a trade pack, on the pricing page .
All trades Painting Landscaping Fire alarm